November 1, 2026

Kaizen Follow-Up: What to Do in the 90 Days After the Event

Kaizen gains often fade in the weeks after the event. A 30, 60 and 90-day kaizen follow-up plan, and a sustain phase lean consultancies can sell to clients.

The short answer

Kaizen follow-up is a fixed routine for the 90 days after the event. Close the open actions in the first 30 days, check the new standard is followed and the measures hold at 30, 60 and 90 days, and have a named coordinator inside the client run it with a monthly review. Most kaizen gains fade because nobody owns those reviews. For a lean consultancy, running them is a sustain phase you can sell to clients you’ve already helped.

Why do kaizen results fade after the event?

The event week is full of energy. Then everyone goes back to their day job, and the open actions sit on a list nobody reads. The Lean Enterprise Institute’s Michael Ballé makes the wider point in Why is it so hard to sustain lean gains?: starting is easy, keeping it going is hard.

The best data point is old but clear. Holweg, Staats and Upton tracked 204 lean projects at a European bank (Harvard Business Review, 2018). 79% showed gains. Of those, 73% still held after one year and 44% after two, so only about a third of all projects held their gains after two years. It was a bank, not a factory.

For a lean or ops consultancy, that shows up as three problems.

Problem 1: you only get paid until handover

Most kaizen work is priced as an event or a project. The fee stops on report-out day, exactly when the follow-up starts. At the same time, SPI Research’s 2026 benchmark put professional services utilisation at about 66% in 2025, the lowest on record. Consultancies are chasing new work while clients who already trust them drift backwards.

The fix (Sell it): offer a sustain phase to clients you’ve already helped, priced as a light monthly fee.

Problem 2: the gains fade and leaders move on

The new standard slips a little each week. Then the sponsor changes roles, and nobody is watching the measures.

The fix (Prove it): a monthly review with their coordinator, a quarterly gemba walk and a results sheet the sponsor actually reads.

Problem 3: it never becomes daily work

In Forrester’s research for SafetyCulture (2026, vendor-commissioned), only 39% of frontline supervisors said improvement is part of their daily work (source). If kaizen is seen as the consultant’s event, it ends when the consultant leaves.

The fix (Grow it): coach their coordinator to run the follow-up, then step back once the measures hold.

I’ve watched the gains fade

Almost 20 years ago in my career, I did lots of work on process improvement and training. During that time I learned frameworks like Six Sigma and Six Hats. I’ll be honest. I never really paid much attention to either. I just knew the company would invest in it and then move on to something else, like it always had.

And that’s pretty much what happened. It seemed like a novelty. Even though we’d had champions in the business, it was forgotten. The priority moved to other things: staying on top of SLAs, covering the management roles made redundant, restructures. What I know now is how important it is to keep at it. Otherwise you lose any gains you tried to embed.

A kaizen event is no different. The 90 days after it decide whether the gains stay.

What should happen in the first 30 days after a kaizen event?

  • Before the team leaves on report-out day, give every open action an owner and a date.
  • Book the 30, 60 and 90-day reviews and the first monthly review now.
  • Name one coordinator inside the client who owns the follow-up.
  • Post the new standard where the work happens, with the two or three measures next to it.
  • The area leader checks the standard briefly each day or week. This is leader standard work, not an audit.
  • Day 30: review with the coordinator. Are the actions closed, is the standard followed, and are the measures holding?

What happens between day 31 and day 90?

  • A monthly review, about an hour, with the coordinator: the measures on one page, what slipped, why, and what changes.
  • Close or re-plan anything still open from the event.
  • Day 60: the same three questions as day 30, plus whether the team is still using the standard without being reminded.
  • Day 90: a gemba walk with the sponsor. They see the area, ask the team questions and decide whether to extend the change.
  • Agree what “holding” means, for example three monthly reviews in a row at or above target.

How long does kaizen follow-up need to last?

Ninety days catches most early drift. The Kaizen Institute describes sustaining as taking 6 to 12 months to embed, which is longer than most engagements run. A light monthly review through that window, plus a quarterly gemba walk, is usually enough.

The 3-step fix for lean and ops consultancies

  1. Sell it. Offer a sustain phase to clients you’ve already helped, starting with the kaizen events you’d be proudest to revisit. Sell it before you build anything.
  2. Prove it. Run the monthly review with their coordinator, the quarterly gemba walk and the results sheet yourself, by hand, for one or two clients.
  3. Grow it. Coach their coordinator to run it, step back once the measures hold, and keep a light monthly fee for support.

They keep the gains. You keep the work.

Frequently asked questions

What is kaizen follow-up?

The routine after a kaizen event that closes open actions, checks the new standard is being followed and confirms the measures held. The first 90 days matter most.

What should a 30, 60 and 90-day kaizen review cover?

Three questions each time: are the actions closed, is the new standard being followed, and are the measures holding? At day 90, add a gemba walk with the sponsor.

Who should own kaizen follow-up?

A named coordinator inside the client, with the area leader checking the standard day to day. The consultant coaches the coordinator and steps back once the measures hold.

Why do kaizen events fail?

Usually because the follow-up is left to chance. Open actions drift, the sponsor’s attention moves on, and the area slides back to the old way of working.

Doesn’t ongoing follow-up create dependence on the consultant?

It will if it has no exit. Agree a step-back point tied to the measures, and coach the coordinator to own the reviews.

Matt Ainsworth ran corporate training in Japan, studied leadership and executive coaching, and has spent 10+ years mentoring startup founders on lean. He helps leadership firms and lean consultancies add the follow-through to what they already sell.

Score your best engagement

Score one past kaizen engagement on the free Engagement Pick Scorecard and see which client would make the best sustain phase.

Try the Engagement Pick Scorecard

Related

About the author

Matt Ainsworth is the founder of The Lean CPTO. He has 20+ years across product, technology, sales, marketing and communications in Australia and nearly a decade in Japan, has mentored founders for 10+ years, and helps leadership, L&D and consulting firms turn a program or method into ongoing support clients pay for every month.

Start with one engagement.

Score one improvement engagement on the free Engagement Pick Scorecard and see the sustain phase it could become, a sample session on your own method, and the one question to ask three past clients, in about a minute.

The Engagement Pick call is free and takes 30 minutes. We pick the engagement with the best shot and map how you'd offer a sustain phase to 3 past clients. You leave with that plan either way.